If I purchase parts A & B as Raw Materials, then transfer into WIP to make part AB with labor added. The part is now a Finished Good. However, if I want to use AB in another assembly, should it be transferred into Raw Materials then back into WIP? What if I had AB manufactured complete from an outside vendor? Is it Raw Materials or Finished Goods?