I have HM I did almost all of it, but I am still having problems with 2 things, please help me with them as I have to submit my HM very soon.

attachment #1-2 is for a question, and #3 is for another question.

Thank you so much for helping
 

Attachments

Triest123

VIP Member
Joined
Feb 12, 2012
Messages
269
Reaction score
51
Hello, all
I have HM I did almost all of it, but I am still having problems with 2 things, please help me with them as I have to submit my HM very soon.

attachment #1-2 is for a question, and #3 is for another question.

Thank you so much for helping
Q2
The overhead rate (based on direct labor hour )
= Total overhead costs / Total direct labor hour hours
= $355,050 / 7,500
= $47.34 per direct labor hour


Q3 (1)
Total direct labor hours = (28000 x 0.46) + (82000 x 0.26)
= 12,880 + 21,320
= 34,200

The predetermined overhead rate = $807,120 / 34,200
= $23.60 per direct labor hour

Q3 (2)
(i) The overhead rate (based on direct labor hour )
= ($807,120 / 2) / 34,200
= $403,560 / 34,200
= $23.60 per direct labor hour

(ii) The overhead rate (based on engineering design hour)
= $403,560 / 6,100
= $66.16 per engineering design hour

You can compute the unit costs by yourself
 
Last edited:
Joined
Jun 23, 2013
Messages
2
Reaction score
0
thanks for helping,
I am still confused.

I want solve for the 4 blanks in this picture
 

Attachments

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments. After that, you can post your question and our members will help you out.

Ask a Question

Members online

No members online now.

Forum statistics

Threads
11,775
Messages
27,839
Members
21,814
Latest member
alea2024

Latest Threads

Top